LUANG PHARBANG VIEW RESORT
PROJECT: LUANG PHARBANG VIEW RESORT
LOCATION: LUANG PHARBANG, LAOS
The total drilling volume of project is around 400 m.
Charged items by HAILAOS:
+ Geotechnical Investigation: Drilling on shore, Standard penetration test (SPT), Vane shear test VST, CPTu, CBR test, Plate load test, testing soil and rock samples (physico-mechanical properties for soil samples (09 properties) according to ASTM Standard, Unconfined compress test, Undrained Unconsolidated Triaxial test (UU), Consolidated Undrained Triaxial Compressive test (CU), Permeability test, Underground water analysis, Physical-mechanical test on rock, Ponit loat test of rock, Compaction test (Unconfined Compression test of soil)...
+ Topographical survey: GPS, RTK…
+ Execution time: May 2024