RIVER SIDE HOTEL


PROJECT: PROJECT: RIVER SIDE HOTEL

LOCATION: LUANG PHARBANG, LAOS

The total drilling volume of project is around 70 m.


Charged items by HAILAOS:

+ Geotechnical Investigation: Drilling on shore, Standard penetration test (SPT), Vane shear test VST, CPTu, testing soil and rock samples (physico-mechanical properties for soil samples (09 properties) according to ASTM Standard, Unconfined compress test, Undrained Unconsolidated Triaxial test (UU), Consolidated Undrained Triaxial Compressive test (CU), Permeability test, Underground water analysis, Physical-mechanical test on rock (Unconfined Compression test)...

+ Topographical survey: GPS, RTK…

+ Execution time: May 2024

Featured Project

Contact Us

Messenger

Zalo

Telegram